Did you know⁉️
The 3KM long A1-A3 Link Road from Chebel to Gros Cailloux cost us, Mauritian Taxpayers Rs295,000,000 💰!
We decided to start by understanding the actual literal value of that road, by checking to see how much 💰 money 💰 can that new road hold?!
🔥We started with a few assumptions:🔥
1. The road is a single lane road (1 left 1 right).
2. The total width of the road is 7m (source: https://www.sciencedirect.com/topics/engineering/road-width)
3. The size of a Rs100 note is, as per Global Average 76mm by 133mm (source:
https://www.banknoteworld.com/blog/the-dimensions-of-money-why-do-banknotes-come-in-different-sizes/#:~:text=Most%20countries%20do%20their%20printing,is%2073mm%20height%20and%20133mm.)
4. Margin of measurement errors at road bends etc are not considered.
Total Area of the Road = 3000m by 7m = 21000 m2.
Total Area of a Single Rs100 note = 0.076*0.133 = 0.010108m2
Total number of Rs100notes = 21000/0.10108 = 2,077,562 notes
2,077,562 Rs100 notes = Rs207,756,200
So, the Rs100 notes on the 3KM road only cover Rs207,756,200.
You would need another Rs87,243,767 or another 872,437 Rs100 Notes to cover the total cost of Rs295,000,000 for the project! 💰💰💰
PS: Its all YOUR Tax Contribution money! 😒
Source: http://www.africain.info/news=5779658